A timing, scoring and display system from Colorado Time Systems has been installed at the recently opened Corby International East Midlands Pool in Northamptonshire.
Suitable for swimming and diving events as well as water-polo, results, scores, advertising and live video can be shown on the company's 2.2m x 4.8m display screen.
The pool also utilises Colorado Time Systems' quick connect system that consists of a single cable from each starting block to the pool deck to reduce on-deck wiring.
Each starting block also houses an integrated speaker, connection plate and Relay Judging Platform (RJP) with speedlight, said to be the most accurate way to judge relay exchanges.
The Corby International East Midlands Pool is an eight lane 50m pool, complete with moveable floors and booms that can be used for swimming, diving, water-polo and synchronised swimming.
|
|
|
|
|
Connect with
hospitality-kit.net |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
RMA Ltd
RMA Ltd is a one-stop global company
that can design, build and produce from a
greenfield site upwards.
View full profile>> |
|
|
|
To advertise your product and reach over 57,000 leisure buyers call
+44 (0)1462 431385 or
email [email protected] |
|
|